Skip to main content

Articles

House Renovation: Budget and How to Start

Published

For a full house renovation, the rough budget depends on the floor area, the materials chosen, the structural condition of the house, and the scope of work involved. The price depends on site conditions and scope — see the latest reference prices on the pricing page. The first step is to photograph the current condition of the house and note the approximate floor area, then send this to F-Fix's LINE so the team can review it before scheduling a technician site visit.

How much budget

Prices are referenced from the F-Fix pricing page (last updated July 2026) and are not final — they must be confirmed with an on-site quote.

The pricing base differs by job type. Full renovation is priced across the whole house's area, suited to homes that want several areas improved at once. Kitchen or storage extensions are priced on the newly added floor area, which includes extra structural work, making the per-sq.m. rate higher. Bathroom renovation is priced per room because it involves plumbing and fixture work specific to that space, rather than being calculated by area like other jobs. If your budget is limited, renovating only the necessary areas is usually easier to control than doing the whole house at once.

Sample calculation

The renovation budget depends on the total floor area, the materials selected, the structural condition of the house, and the actual scope of work required. The price depends on site conditions and scope — see the latest reference prices on the pricing page. This reference must still be confirmed with a formal quote before work begins.

Budgets calculated by square meter often miss items that are easy to forget, such as demolition of existing structures, hauling debris and waste off site, and waterproofing at leak-prone spots. These items should be asked about and clearly listed in the on-site quote so the budget doesn't balloon later.

5 steps to get started

  1. Measure the area and take photos — Walk through the space you want renovated, photograph its current condition, and estimate the area.
  2. Send the details via LINE — Send the photos along with your requirements and the house's location to the F-Fix team.
  3. The team reviews and schedules a site visit — This step is always needed to get a price matching the real condition, with a site visit fee of 500 ฿ in-province or 2,000 ฿ out-of-province.
  4. Receive the quote — After the site visit, you'll receive a quote clearly stating the scope of work and price.
  5. Confirm and schedule the job — Once you confirm the price and details, a start date is scheduled with the assigned technician.

For minor fixes unrelated to structure or plumbing/electrical systems, homeowners may be able to handle some things themselves first. But work involving structure, pipework, or wiring inside walls should always have a technician inspect the site first, since square-meter-based pricing is only a preliminary figure that doesn't account for each house's actual site conditions.

The F-Fix team reviews the information you send before matching you with a suitable technician, then shows you the technician's details and price for your consideration before any work starts. Nothing begins without your confirmation, and completed work comes with a warranty. See details on the house renovation service page or the renovation service page, and read about the team's credibility on the trust page (available in Chinese and English).

What to send on LINE

Your first message to F-Fix's LINE should include:

  • Photos of the house's condition or the actual area to be renovated
  • Approximate area (sq.m.) or number of rooms involved
  • The address or province where the house is located
  • The scope of work wanted, e.g. full renovation, bathroom only, or kitchen extension

The team will review this initial information and schedule a technician site visit as described above, before finalizing the price into a quote for your review.

In short, a renovation budget can be roughly estimated from area multiplied by the per-square-meter price range, but the actual figure depends on a site visit and quote. When ready, send photos of your house's condition and area details to F-Fix's LINE, or find other contact channels on the F-Fix contact page so the team can review and schedule a technician site visit.

Frequently Asked Questions (FAQ)

How much budget does a full house renovation need?

The budget for a full house renovation depends on the total floor area, the materials chosen, the structural condition of the house, and the scope of work required. The price depends on site conditions and scope — see the latest reference prices on the pricing page. The final price is confirmed with an on-site quote.

Is there a fee for the site visit?

Yes, there is a site visit fee: 500 ฿ in-province and 2,000 ฿ out-of-province. This step is always required to get a price that matches the house's real condition.

How does a kitchen extension or bathroom renovation differ from a full renovation?

A kitchen or storage extension is priced by the newly added area, while a bathroom renovation is priced per room, since it involves plumbing and fixture work specific to that space rather than being calculated by area like a full renovation. The price depends on site conditions and scope — see the latest reference prices on the pricing page.

What needs to happen before getting a quote?

You need to send photos and details via LINE for the team to review first. They will then schedule a technician site visit, which is a required step before a quote can be finalized.

Ready to get it fixed?

Message us on LINE. The price comes back before anyone turns up.

What to put in the first message

  1. 1photos of what is broken — one wide, one close on the problem
  2. 2what it is doing, when it started and how long it has been like that
  3. 3the province or district the technician has to come to
  4. 4the times of day a technician can come